Saturday, May 29, 2010

Construction Day 2

Construction of the installation was finished yesterday, pictures of this stage of progress are below. All that remains to do now is to add the artistic elements which will be done on Monday.

Pictures and updates of this will follow.

How construction ended on Day 1


Adding the cover to the door


Covering the door


Adding the window


Securing the window


Hanging the door


Hanging the door


Securing the wall cover


The covered shelf 


Measuring for the wall cover


Nearly there


Fixing the last bit of wall covering


Adding velcro for the access hatch


Adding velcro for the access hatch


The access hatch


The finished build


The finished build


The working controller


The working controller

Thursday, May 27, 2010

Project Update

Ok, so it's been quite awhile since we've been here, so here's a low down on whats been happening.

The graphic department has come up trumps with the graphical elements, some of which were shown in the previous posting, along with all the animations required for each of the game levels.

The sound department has field recorded all of the audio required and has since processed these into their final formats for use with the games.

The programming department has been working feverishly to get the games working together which has come together nicely, with everything linking together and flowing for the story.

There was a real sense of accomplishment in the air today as construction began on the physical housing for the project. Included with the post are some pictures taken during construction.

Another update will follow tomorrow along with pictures of tomorrows construction and artistic additions.

Frame work


Fixing it together


Checking the structure

Securing the skeleton

Building the skeleton

Securing the skeleton

Roof added

Roof added

Roof added

Roof added

Stapling the walls

Covering the walls

Inside the ship

Inside the ship

Back of the controller

Measuring for the door

Fixing the supports


Shelf for the controller and screen

The finished shelf for the controller and screen